Price, Ickes and Fairless during Inspection Read more about Price, Ickes and Fairless during Inspection Ed Price (left), General Superintendent, Lorain Works; Harold L. Ickes (center), Petroleum Administrator for War; and B.F. Fairless (right) during an inspection of 24 inch pipe for a 550 mile pipeline.