View of flood waters from Arkansas River
View of flood water from Arkansas River that caused construction to halt on second War Emergency Pipeline near site of "Big Inch" break under rampaging River.
Back wash water of flooded Arkansas River which stalled highway traffic and pipeline construction work on Petroleum Administration's second Texas East Coast pipeline. Aerial view shows high water conditions and pipe strung ready for welding along second pipeline right-of-way near flood break in "Big Inch."
Group of veteran pipeliners stringing pipe for emergency by-pass loop in Arkansas. The by-pass loop restored major oil movement to the East, which was disrupted by a flood on the Arkansas River. Many pipeliners worked 24 hours at a stretch to help complete the by-pass loop quickly. Five hundred veteran pipeliners volunteered to build the 8-mile by-pass of the flood break in the "Big Inch." All workers unidentified.