Breadcrumb

  1. Home
  2. Library Collections
  3. Photographs
  4. President Truman Starts Operation of New Generator at Grand Coulee Dam

President Truman Starts Operation of New Generator at Grand Coulee Dam

73-3053
Accession Number
73-3053
8x10 inches (21x26 cm)
Black & White
HST Keywords
Truman - Ceremonies - Dedications - Presidency Truman - Cabinet - Truman with Members
Rights

Public Domain - This item is in the public domain and can be used freely without further permission.

Note: If you use this image, rights assessment and attribution are your responsibility.

Credit:

Harry S. Truman Library & Museum.

Attention media: Please make note of this item's accession number. Print out this page and retain it for your permissions records before downloading this image file for possible publication. Library staff cannot sign permissions forms or provide additional paperwork. The Library charges no usage fees for downloaded images.

Description
President Harry S. Truman (sitting down) is pushing a button to start operation of a new generator at Grand Coulee Dam situated on the Columbia River in the state of Washington. He is shown at his desk in the Oval Office. Standing left to right: C. Girard Davidson, Assistant Secretary of the Interior; Julius A. Krug, Secretary of the Interior; and unidentified.
Date(s)
May 20, 1949