West view in Ground Floor Corridor. The finish plaster coat on the ceiling has been completed except at the west end. This was taken during the renovation of the White House.
View of upper west wall and ceiling of State Dining Room. Plasterers are working on finish course for installing ornamental frieze. This was taken during the renovation of the White House.
View of the ceiling of the State Dining Room to the west wall. The rough plastering course has been applied to the ceiling with openings left for ornamental frieze, loud speaker grills, and centerpiece. This was taken during the renovation of the White House.
North wall of Sitting Room No. 19 above wooden scaffolding. The circular design of this wall was required to provide adequate closet space below. This was taken during the White House renovation.
Northeast view in Sitting Room 19 below wooden scaffolding. The completed rough plastering coat is seen on the wall. This was taken at the White House during the renovation.
West view in Family Dining Room showing upper and lower pantries. Along inside west wall of the pantry are the servants' elevator, circular stairway, and two dumb-waiters. This was taken at the White House during renovation.
Northeast view in East Room. Workmen on high wooden scaffolding are installing wire mesh for plastering on metal hangers of ceiling, except for openings for ornamental designs and frieze. This was taken in the White House during renovation.