View of North Portico floor and main entrance of the White House during renovation. The new floor and steps are of gray Tennessee marble. Three coats of paint, except on bases of columns, had been completed on the entire north front.
View of north front west of North Portico of the White House during renovation. The wall between the columns has been removed on the west and east sides, and a landing and steps of gray Tennessee marble permit entrance from these areas.
Southwest view in north central area of ground floor (G-24 into G-23, G-22 and G-21) during White House renovation. The doorway on the left leads to the corridor.
West wall of White House library (G-1) during renovation. The tile facing of the mantel, depicting Washington historic scenes with the President's seal at the upper center, has been reset.
West view of the third floor corridor of the White House during the renovation. Carpenters are laying finish floor of red oak in herring-bone design over sub-flooring.